韩国在线观看AV片,啦啦啦视频在线资源,俄罗斯高清XXXXX,日本人真人做受免费视频

Welcome to the official website of Hebei Chaoda sealing products Co., Ltd!
河北超達密封制品股份有限公司
news information
information
news information INDEX > news information > Industry News > Construction requirements for polyurethane waterproof coating

Construction requirements for polyurethane waterproof coating

Time:2023.04.27     News sources: Hebei Chaoda Sealing Products Co., Ltd

1. The base surface is required to be flat, clean, free from sand and looseness, and with a moisture content of less than 8%.

2. During construction, the base surface acceptance should be carried out first to ensure compliance with the requirements. A layer of primer must be applied first, and the primer must be uniform.

3. After the adhesive has solidified, proceed with a second application, with the direction of the application perpendicular to the previous one to prevent missed scratches. Apply three to five times in sequence.

4. After completion, no personnel are allowed to enter or proceed to the next process before the waterproof layer has solidified, in order to avoid damaging the waterproof layer.

≡  CONTACTS:Manager Wu ≡  TELEPHONE:0319-4368088 0319-4333899 ≡  FAX:0319-4368269 0319-4333899 ≡  MOBILE機:13932919068 ≡  ADDRESS:West Julu and Technological Development Zone
河北超達密封
Copyright: Hebei Chaoda sealing products Co., Ltd      technical support:邢臺市網(wǎng)商軟件開發(fā)有限公司
網(wǎng)站備案/許可證號:冀ICP備19029174

Official wechat

河北超達密封

Mobile website

主站蜘蛛池模板: 丽水市| 顺平县| 兴城市| 虎林市| 柞水县| 定安县| 隆昌县| 凤阳县| 汝城县| 东兰县| 华坪县| 镇原县| 宝丰县| 汝城县| 壶关县| 都匀市| 通辽市| 姜堰市| 汤阴县| 晋江市| 深泽县| 益阳市| 洛扎县| 准格尔旗| 明光市| 蓬安县| 大同市| 荔波县| 商丘市| 工布江达县| 扶沟县| 钦州市| 崇仁县| 理塘县| 樟树市| 郴州市| 申扎县| 监利县| 安龙县| 应用必备| 象山县|