老师破女学生处特级毛片,欧美毛多水多肥妇,手机在线看片欧美亚洲A片,中国少妇与黑人3p视频

Welcome to the official website of Hebei Chaoda sealing products Co., Ltd!
河北超達(dá)密封制品股份有限公司
news information
information
news information INDEX > news information > Industry News > Construction requirements for polyurethane waterproof coating

Construction requirements for polyurethane waterproof coating

Time:2023.04.27     News sources: Hebei Chaoda Sealing Products Co., Ltd

1. The base surface is required to be flat, clean, free from sand and looseness, and with a moisture content of less than 8%.

2. During construction, the base surface acceptance should be carried out first to ensure compliance with the requirements. A layer of primer must be applied first, and the primer must be uniform.

3. After the adhesive has solidified, proceed with a second application, with the direction of the application perpendicular to the previous one to prevent missed scratches. Apply three to five times in sequence.

4. After completion, no personnel are allowed to enter or proceed to the next process before the waterproof layer has solidified, in order to avoid damaging the waterproof layer.

≡  CONTACTS:Manager Wu ≡  TELEPHONE:0319-4368088 0319-4333899 ≡  FAX:0319-4368269 0319-4333899 ≡  MOBILE機(jī):13932919068 ≡  ADDRESS:West Julu and Technological Development Zone
河北超達(dá)密封
Copyright: Hebei Chaoda sealing products Co., Ltd      technical support:邢臺(tái)市網(wǎng)商軟件開發(fā)有限公司
網(wǎng)站備案/許可證號(hào):冀ICP備19029174

Official wechat

河北超達(dá)密封

Mobile website

山阴县| 舟曲县| 邹平县| 荥阳市| 翁源县| 南郑县| 芦山县| 伊金霍洛旗| 遵义县| 茌平县| 霍林郭勒市| 江山市| 任丘市| 芦山县| 靖州| 枣阳市| 印江| 白玉县| 寿阳县| 长岛县| 旺苍县| 灵石县| 阿鲁科尔沁旗| 方城县| 那曲县| 霍山县| 芦山县| 陕西省| 宝坻区| 嘉定区| 广州市| 潞西市| 文水县| 太湖县| 新郑市| 武汉市| 甘洛县| 陆良县| 左贡县| 白朗县| 清丰县|